
I am making it public record that I now have too many projects started and it will be well into 2007 before I finish them. I finished the felted mittens, and am finishing the second Nasturtium sock. Then I started the blue top-down sweater—the one that used to be Debbie Bliss’ Classic Jacket until it morphed into a top-down sweater while sleeping in my knitting basket. Then I decided that I need at least two more pair of warm, worsted wool socks for winter, because my feet are already cold. So, I cast on for the socks with Paton’s Classic Wool in olive. Before I could count all the projects and "get a grip," I was bitten by the hat bug again and started another one with a 50% soy yarn called Wick. AND I am still working on DD’s Buttercreme Shawl. Now I am jumping from one thing to another, hoping I will eventually decide that one of them is a priority.

The worsted wool socks are my old standby pattern of cast on 48 stitches, knit four inches of K4, P2 ribbing, then start the heel. I add a second color to the toe with lace or fingering weight yarn, to both reinforce and add contrast. I think I will use yellow on the olive socks. The blue sweater is a standard top-down pattern that I am making up as I go along. I will do a sketch and write down the pattern as I knit, so I can share later.
When I think about it—what could be better than having too many knitting projects? It means that I’m going to have to spend a lot of time knitting, and less time on other, not so pleasant things. Life is good!
1 comment:
I have too much guilt to start more than one project.lol.
Post a Comment